Feasibility and design summary report (phase V : a diffusion-type CB pod) on collective protection for combat field structures / submitted by Calvin A. Hagberg.
Document
Feasibility and design summary report (phase V : a diffusion-type CB pod) on collective protection for combat field structures / submitted by Calvin A. Hagberg.
Copies
1 Total copies, 1 Copies are in, 0 Copies are out.
Prepared for U. S. Army Edgewood Arsenal, 28 June 1963 - 31 July 1966.
  • Share It:
  • Pinterest