Cost estimate, Ledo Road.
e-Document
Cost estimate, Ledo Road.
Copies
0 Total copies, 0 Copies are in, 0 Copies are out.
Details direct and indirect costs, as well as comparative direct costs. Annex A: detailed cost estimate (total quantities method) and assumptions used in preparing cost estimate. Appendix B: detailed cost estimate (alternate method- unit costs). Appendix C: India Burma Theater estimate (extract from IBT report #205).
  • Share It:
  • Pinterest